Resources
Company News
Industry News
Knowledge Base
Project Cases
Innovation
Tianhai Conducts Comprehensive Emergency Drill to Strengthen Workplace Safety Defenses
Company Mid – Year Summary and Team – Building Activity Report
Is geomembrane a geotechnical engineering material?
What are the application scenarios of geomembrane?
What are the functions of geotextiles?
Cómo elegir geomembrana de hdpe en proyectos de ingeniería
How to choose hdpe geomembrane in engineering projects
¿Qué ancho elegir para geomembrana?
Prueba de envejecimiento térmico de geomembrana.
Cinco pasos para la soldadura de geomembranas
China’s Geotechnical Construction Materials Embrace New Opportunities
Tips for Moisture-Proof Storage of Geotextiles
Key Construction Points and Precautions for High-Density Polyethylene Geomembrane
what is pond lining material ?
What is geomembrane?
HDPE geomembrane construction plans and technical measures
What quality tests do HDPE geomembranes need to do?
Tinhy’s MDS® Drainage Solution
Installation Robots
HDPE vs PVC Geomembrane: What Is the Difference?
LDPE vs HDPE Geomembrane: What Is the Difference?
What’s the Average Cost to Replace an Inground Pool Liner?
Can I Lay a New Pond Liner Over an Old One?
How to Seal a Geomembrane Properly?
What Is the Most Durable Pond Liner Material?
Is Geomembrane Waterproof?
How to Choose the Right HDPE Geomembrane Thickness for Different Projects
HDPE Geomembrane Cost Per Square Meter
Differences between Geotextile and Felt
Should HDPE or PVC be used to install geomembrane in reservoirs?
What is the price of geomembrane?
Material characteristics of three different geomembranes
Esquema de construcción de geomembrana de HDPE y medidas técnicas
hdpe geomembrane pond liner in Congo (DRC)
How to lay and weld HDPE geomembrane?
HDPE geomembrane 0.2-4.0mm
HOME ABOUT PRODUCTS APPLICATION CONTENTUS RESOURCES
Home Resources Company News HDPE geomembrane construction technology

HDPE geomembrane construction technology

time:05 6 月, 2023 Views:11

HDPE geomembrane construction technology

Founded in 2002, the company has accumulated 20 years of experience in the production of HDPE geomembranes. Through cooperation with Jinming Seiki, the top international blown film equipment manufacturer, it has jointly cooperated with international manufacturers including HAAS four-axis precision machining center in the United States and NCS in Spain.

A. Super-large high-precision gantry machining center, DMG super-large five-axis precision machining center, NILES CNC precision gear grinding machine, Ms. Xiao Huachun, an expert member of the International Organization for Standardization Geosynthetics Technical Committee (ISO/TC221), jointly developed an internationally leading Four-layer co-extrusion blown film equipment.

The geomembrane equipment adopts the world’s leading blown film die head, supplemented by seven major control systems: central centralized feeding system, uniformity and degree consistency control system, electric spark hole detection system, film thickness detection system, automatic width control system , internal cooling system and high-altitude expansion system.

It solves the quality problems that plague the industry such as slow cooling, uneven width, uneven thickness, holes and creases formed in rolls. Whether it is from the appearance or from the internal quality, it has reached the world advanced level, and it is one of the core equipment of our company.

Geomembrane has become a landmark product for our company to participate in domestic and foreign projects, and 17 parameters far exceed GB/T-2011GH2S (national standard environmental protection type), CJ/T234-2006 (urban construction standard), and have reached ASTM standards.

Preparatory work before geomembrane installation

1. Before laying and installing HDPE geomembrane, invite the owner, designer, on-site supervisor and relevant units to conduct a pre-construction preparatory meeting. The meeting will finally determine the construction details of the anti-seepage construction and solve various new problems that appear on the site. Condition.

2. Do a good job in the maintenance and unblocking of the power line before the construction of the geomembrane; the maintenance of the construction machinery and tools is in place; the labor arrangement is ready and other preparations.

3. The geomembrane can only be laid after the process of the lower layer of the geomembrane is accepted, and the HDPE geomembrane cannot be laid without acceptance.

4. The construction must be carried out in accordance with the approved documents and the written consent of the project supervisor for our construction proposal. Records should be made during geomembrane construction and submitted to the owner for future reference.

Geomembrane Welding Process By a Welding Machine

5. Construction equipment, machines and tools, and HDPE geomembrane materials should be inspected before construction. HDPE geotechnical
The membrane material certificate should be kept for future reference, and the package should be opened to check the appearance quality of the HDPE geomembrane, and the mechanical damage and production trauma, holes, breakage and other defects found should be recorded and repaired.

6. The HDPE geomembrane that is damaged and difficult to repair should be cut off, and the HDPE geomembrane material must be approved by the supervisory engineer before construction.

[wpforms id=”40″]

Company News
Share:
info@tinhygeosynthetics.com




    Consultation
    Submit
    Get The Latest Product Prices

    Your inquiries are welcomed at any time and please feel free to contact us via email, phone calls, and online chatbox on our site.

    We will definitely give you a reply ASAP after we receive your messages.

      0/180