Resources
Company News
Industry News
Knowledge Base
Project Cases
Innovation
Tianhai Conducts Comprehensive Emergency Drill to Strengthen Workplace Safety Defenses
Company Mid – Year Summary and Team – Building Activity Report
Is geomembrane a geotechnical engineering material?
What are the application scenarios of geomembrane?
What are the functions of geotextiles?
Cómo elegir geomembrana de hdpe en proyectos de ingeniería
How to choose hdpe geomembrane in engineering projects
¿Qué ancho elegir para geomembrana?
Prueba de envejecimiento térmico de geomembrana.
Cinco pasos para la soldadura de geomembranas
China’s Geotechnical Construction Materials Embrace New Opportunities
Tips for Moisture-Proof Storage of Geotextiles
Key Construction Points and Precautions for High-Density Polyethylene Geomembrane
what is pond lining material ?
What is geomembrane?
HDPE geomembrane construction plans and technical measures
What quality tests do HDPE geomembranes need to do?
Tinhy’s MDS® Drainage Solution
Installation Robots
HDPE vs LDPE Pond Liners: Which Is Better for Large Pond Projects?
The Functions and Applications of Geotextile and Geomembrane
Geomembrane Liner Installation: Step-by-Step Guide for Proper Performance
Geomembrane Liner Supplier: How to Choose a Reliable Partner for Your Project
HDPE Geomembrane Lifespan: How Long Do HDPE Liners Last?
Filament Nonwoven Geotextile vs Staple Fiber Geotextile: What’s the Difference?
Geomembrane Applications: Where and How Geomembranes Are Used
Geotextile vs Geomembrane: What Is the Difference?
HDPE Liners Explained: Uses, Features & Installation
HDPE vs PVC Geomembrane: What Is the Difference?
Should HDPE or PVC be used to install geomembrane in reservoirs?
What is the price of geomembrane?
Material characteristics of three different geomembranes
Esquema de construcción de geomembrana de HDPE y medidas técnicas
hdpe geomembrane pond liner in Congo (DRC)
How to lay and weld HDPE geomembrane?
HDPE geomembrane 0.2-4.0mm
HOME ABOUT PRODUCTS APPLICATION CONTENTUS RESOURCES
Home Resources Company News How to lay geomembrane

How to lay geomembrane

time:26 9 月, 2023 Views:40

How to lay geomembrane

The laying method of geomembrane has an important impact on the anti-seepage effect and durability of the channel anti-seepage and water-saving renovation project.

During the laying process, the bottom of the channel should first be cleaned and leveled to ensure good contact between the geomembrane and the base layer.

The geomembrane should then be cut and spliced according to the design requirements to match the shape and size of the channel.

Finally, the geomembrane should be securely fixed to the bottom of the channel using welding or adhesive to prevent it from moving or breaking.


Precautions for construction of geomembrane

During the construction process of the channel anti-seepage and water-saving renovation project, the following points should be paid attention to: First, the quality of the geomembrane should be ensured to meet the design requirements, and strict inspection and testing should be carried out to avoid the use of inferior materials.

Secondly, the flatness and cleanliness of the base layer should be ensured to avoid bubbles or gaps between the geomembrane and the base layer.

Finally, construction quality and safety should be strictly controlled to ensure that the anti-seepage effect and service life of the project meet the expected requirements.

Why is the finished composite geomembrane containing water?

Before the production of composite geomembrane, the geotextile required for the composite geomembrane must be produced according to corresponding specifications.

When producing the composite membrane, the geotextile must be fixed on the production equipment in advance. The temperature of the geomembrane is relatively high during extrusion.

Yes, the geotextile is compounded on the surface of the geomembrane before solidification, so that the geomembrane and geotextile can be bonded together.

When most composite membranes are produced, the sides need to be flanged to facilitate welding during construction. The flanging requires adding water to the side of the geomembrane to cool it before the geomembrane and geotextile are composited, so that the sides cannot Composite with geotextile.

Because the geotextile is water-absorbent, the geotextile will absorb part of the water when the edge is flung and cannot be kept dry, but this will not affect the performance of the composite geomembrane.

Therefore, as long as the composite geomembrane is flanged, it contains moisture when it leaves the factory. This is a normal phenomenon.

During welding construction, it is necessary to wipe off the moisture on one side of the welding before welding, so as to ensure that the welding is firm. .

Company News
Share:
info@tinhygeosynthetics.com Bai Jinxi




    Consultation
    Submit