Resources
Company News
Industry News
Knowledge Base
Project Cases
Innovation
Tianhai Conducts Comprehensive Emergency Drill to Strengthen Workplace Safety Defenses
Company Mid – Year Summary and Team – Building Activity Report
Is geomembrane a geotechnical engineering material?
What are the application scenarios of geomembrane?
What are the functions of geotextiles?
Cómo elegir geomembrana de hdpe en proyectos de ingeniería
How to choose hdpe geomembrane in engineering projects
¿Qué ancho elegir para geomembrana?
Prueba de envejecimiento térmico de geomembrana.
Cinco pasos para la soldadura de geomembranas
China’s Geotechnical Construction Materials Embrace New Opportunities
Tips for Moisture-Proof Storage of Geotextiles
Key Construction Points and Precautions for High-Density Polyethylene Geomembrane
what is pond lining material ?
What is geomembrane?
HDPE geomembrane construction plans and technical measures
What quality tests do HDPE geomembranes need to do?
Tinhy’s MDS® Drainage Solution
Installation Robots
HDPE vs PVC Geomembrane: What Is the Difference?
LDPE vs HDPE Geomembrane: What Is the Difference?
What’s the Average Cost to Replace an Inground Pool Liner?
Can I Lay a New Pond Liner Over an Old One?
How to Seal a Geomembrane Properly?
What Is the Most Durable Pond Liner Material?
Is Geomembrane Waterproof?
How to Choose the Right HDPE Geomembrane Thickness for Different Projects
HDPE Geomembrane Cost Per Square Meter
Differences between Geotextile and Felt
Should HDPE or PVC be used to install geomembrane in reservoirs?
What is the price of geomembrane?
Material characteristics of three different geomembranes
Esquema de construcción de geomembrana de HDPE y medidas técnicas
hdpe geomembrane pond liner in Congo (DRC)
How to lay and weld HDPE geomembrane?
HDPE geomembrane 0.2-4.0mm
HOME ABOUT PRODUCTS APPLICATION CONTENTUS RESOURCES
Home Resources Company News Treatment of special parts of HDPE geomembrane

Treatment of special parts of HDPE geomembrane

time:06 6 月, 2023 Views:14

Treatment of special parts of HDPE geomembrane

1) At the intersection of slopes, the laying and welding of HDPE geomembrane is a special case; corresponding measures should be taken according to local conditions to make the membrane more closely fit with the base.

The main points of construction in this case are: the diaphragm in the irregular range such as turning should be cut into an “inverted trapezoid” with a small width at the top and a small bottom. If the ratio is inaccurate, it will cause the geomembrane surface on the slope to “bulge” or “suspend”.

2) Special treatment is also required at the foot of the slope where the entire slope of the landfill area connects with the bottom of the reservoir. The main points of construction are: Lay the HDPE geomembrane of the slope along the slope surface 1.5m away from the foot of the slope, and then weld it with the HDPE membrane at the bottom of the reservoir.

3) At the place where the leachate collection pipe penetrates the dam in the landfill area, the connection and welding between the pipe and the membrane should be constructed using the special process of “pipe piercing the membrane”.

The key points of its construction are: first use HDPE geomembrane to make a trumpet-shaped sleeve, the radius of which is consistent with the diameter of the membrane-piercing pipe, and the maximum radius is about 0.8 meters (the specific size will be determined during installation) and divided into 6-8 small pieces, and then put The sleeves are inserted into the dam pipe in order from large to small.

Adjust the position of the sleeves according to the actual situation on site and temporarily stabilize them with a hot air gun. The large and small sockets of the pipe are welded on the HDPE geomembrane surface of the anti-seepage layer and the leachate collection pipe, and a stainless steel hoop is added to the HDPE collection pipe.


4) During the entire construction process, for the repaired parts after sampling and the places where normal welding construction cannot be used, it is necessary to formulate construction details according to local conditions according to the actual situation on site, and use special technology for construction of geomembrane.

The secondary welding of welds such as “T type” and “double T type” belongs to special part welding.

Company News
Share:
info@tinhygeosynthetics.com




    Consultation
    Submit
    Get The Latest Product Prices

    Your inquiries are welcomed at any time and please feel free to contact us via email, phone calls, and online chatbox on our site.

    We will definitely give you a reply ASAP after we receive your messages.

      0/180