Resources
Company News
Industry News
Knowledge Base
Project Cases
Innovation
Tianhai Conducts Comprehensive Emergency Drill to Strengthen Workplace Safety Defenses
Company Mid – Year Summary and Team – Building Activity Report
Is geomembrane a geotechnical engineering material?
What are the application scenarios of geomembrane?
What are the functions of geotextiles?
Cómo elegir geomembrana de hdpe en proyectos de ingeniería
How to choose hdpe geomembrane in engineering projects
¿Qué ancho elegir para geomembrana?
Prueba de envejecimiento térmico de geomembrana.
Cinco pasos para la soldadura de geomembranas
China’s Geotechnical Construction Materials Embrace New Opportunities
Tips for Moisture-Proof Storage of Geotextiles
Key Construction Points and Precautions for High-Density Polyethylene Geomembrane
what is pond lining material ?
What is geomembrane?
HDPE geomembrane construction plans and technical measures
What quality tests do HDPE geomembranes need to do?
Tinhy’s MDS® Drainage Solution
Installation Robots
Geotextile vs Geomembrane: What Is the Difference?
HDPE Liners Explained: Uses, Features & Installation
HDPE vs PVC Geomembrane: What Is the Difference?
LDPE vs HDPE Geomembrane: What Is the Difference?
What’s the Average Cost to Replace an Inground Pool Liner?
Can I Lay a New Pond Liner Over an Old One?
How to Seal a Geomembrane Properly?
What Is the Most Durable Pond Liner Material?
Is Geomembrane Waterproof?
How to Choose the Right HDPE Geomembrane Thickness for Different Projects
Should HDPE or PVC be used to install geomembrane in reservoirs?
What is the price of geomembrane?
Material characteristics of three different geomembranes
Esquema de construcción de geomembrana de HDPE y medidas técnicas
hdpe geomembrane pond liner in Congo (DRC)
How to lay and weld HDPE geomembrane?
HDPE geomembrane 0.2-4.0mm
HOME ABOUT PRODUCTS APPLICATION CONTENTUS RESOURCES
Home Resources Company News Why does tailings pond project need geomembrane?

Why does tailings pond project need geomembrane?

time:29 8 月, 2023 Views:16

Why does tailings pond project need geomembrane?

In the construction of tailings ponds, it is usually necessary to consider the use of geomembranes to meet specific environmental and protection requirements. The following are some common situations where geomembranes may need to be applied to tailings storage:

Anti-seepage barrier: Tailings contain hazardous substances and chemicals that can contaminate the environment and ecosystem if they seep into groundwater or surrounding soil. The geomembrane acts as an anti-seepage barrier on the bottom and side walls of the tailings pond, which can prevent the penetration of harmful substances and reduce the risk of leakage.

Soil protection and separation: The bottom and side walls of the tailings pond are composed of original soil and accumulated soil. Geomembranes can be used to protect the soil, prevent harmful substances from eroding the soil, and mix between different soil layers. It can provide soil separation and protection, ensuring the stability of the tailings pond structure and the safety of the environment.

Protection against bottom infiltration: The bottom of a tailings pond may come into contact with groundwater or bodies of water, and without proper protection, the bottom may be affected by infiltration. The geomembrane can act as an anti-seepage barrier, forming a sealed layer at the bottom of the tailings pond, preventing the infiltration of water and the release of harmful substances.

Water barriers and protective layers: Geological conditions and environmental requirements around tailings ponds may require water barriers and protective layers. Geomembrane can be used as a key layer in the water barrier to ensure the operation of the tailings pond and the protection of the surrounding environment.

It should be pointed out that the use of geomembrane is not a general requirement in the design and construction of tailings ponds, but is determined according to specific engineering requirements and environmental assessment. The design and construction of tailings ponds should follow relevant regulations and standards, and rely on detailed engineering planning and evaluation. In actual operation, professional environmental engineers, civil engineers and hydraulic engineers will provide guidance to ensure the correct application of the appropriate geomembrane type, specification and installation method.

How to install geomembrane for tailings pond?

Preparation:

According to the design requirements and geological survey results, determine the required geomembrane type, specification and quantity.
Clean the bottom and side wall surfaces of the tailings pond to ensure a smooth surface and remove loose and sharp objects.
Determine the laying direction and position of the geomembrane according to the design requirements, and mark the boundary lines and fixed points.
Laying geomembrane:

Place the geomembrane roll on the laying position and gradually unroll it to ensure that the geomembrane covers the entire bottom and side walls of the tailings pond and extends far enough beyond the fixed edge of the geomembrane.
Make sure that the geomembrane has no obvious wrinkles and voids during laying. If damage is found, repair materials can be used to repair it.
Fixed geomembrane:

Fix the geomembrane on the bottom and side walls of the tailings pond with fixings (such as U-shaped anchors, interface plates or nails). The fixed spacing and method should be determined according to the design requirements and the characteristics of the geomembrane.
The fixing parts should be properly distributed, usually fixed at the edge and central part of the geomembrane to ensure the stability of the geomembrane.
Join and cover edges:

If necessary, the geomembrane can be connected by hot-melt connection or special connection material. Make sure the connections are tight and adequately sealed to prevent water penetration.
Around the edges of the geomembrane, a covering treatment is performed. Filling, such as earthfill, is usually used to cover and secure the edges of the geomembrane.

Check and fix:

After the geomembrane is laid, a comprehensive inspection is carried out to ensure the integrity of the geomembrane and no damaged parts.
If any damage or problem is found, repair it in time, and ensure that the repaired part is tightly bonded to the surrounding geomembrane.
Please note that the method of geomembrane installation for tailings ponds may vary due to factors such as project requirements, material type, and environmental conditions. Therefore, during the construction process, it is recommended to cooperate with professional engineers, construction teams or relevant technical personnel, and follow relevant technical specifications and suggestions. They can provide detailed guidance on a case-by-case basis to ensure proper installation and performance of the geomembrane as expected.

Company News
Share:
info@tinhygeosynthetics.com




    Consultation
    Submit
    Get The Latest Product Prices

    Your inquiries are welcomed at any time and please feel free to contact us via email, phone calls, and online chatbox on our site.

    We will definitely give you a reply ASAP after we receive your messages.

      0/180