Resources
Company News
Industry News
Knowledge Base
Project Cases
Innovation
Empowering New Talent, Building the Future: Tinhy Successfully Conducts New Employee Orientation Training
Tinhy Conducts Comprehensive Emergency Drill to Strengthen Workplace Safety Defenses
Company Mid – Year Summary and Team – Building Activity Report
Is geomembrane a geotechnical engineering material?
What are the application scenarios of geomembrane?
What are the functions of geotextiles?
Cómo elegir geomembrana de hdpe en proyectos de ingeniería
How to choose hdpe geomembrane in engineering projects
¿Qué ancho elegir para geomembrana?
Prueba de envejecimiento térmico de geomembrana.
China’s Geotechnical Construction Materials Embrace New Opportunities
Tips for Moisture-Proof Storage of Geotextiles
Key Construction Points and Precautions for High-Density Polyethylene Geomembrane
what is pond lining material ?
What is geomembrane?
HDPE geomembrane construction plans and technical measures
What quality tests do HDPE geomembranes need to do?
Tinhy’s MDS® Drainage Solution
Installation Robots
High Density Polyethylene Geomembrane: Why It Has Become the Industry Standard for Containment Systems
Top Non Woven Geotextile Fabric Manufacturers in 2026: Complete Buyer’s Guide
High Density Polyethylene Pond Liner: Why More Pond Owners Are Switching to HDPE in 2026
Top 10 Geo Fabric Manufacturers in 2026: Global Leaders in Geosynthetic Solutions
What Is Nonwoven Geotextile Fabric? A Complete Guide to Applications, Benefits, and Selection
HDPE Lining Manufacturer: How to Choose the Right Partner for Containment and Environmental Projects
Geo Fabric Suppliers: 7 Things Global Buyers Must Know Before Importing in 2026
Top Geotextile Factory in China: How to Choose the Right Manufacturer for Infrastructure Projects?
Top Geotech Fabric Suppliers in 2026: Where Global Infrastructure Projects Source Geosynthetics?
Geotextile Cloth Suppliers: Complete Guide to Products, Applications and Global Sourcing in 2026
Should HDPE or PVC be used to install geomembrane in reservoirs?
What is the price of geomembrane?
Material characteristics of three different geomembranes
Esquema de construcción de geomembrana de HDPE y medidas técnicas
hdpe geomembrane pond liner in Congo (DRC)
How to lay and weld HDPE geomembrane?
HDPE geomembrane 0.2-4.0mm
HOME ABOUT PRODUCTS APPLICATION CONTENTUS RESOURCES
Home Resources Knowledge Base Construction Difficulties of Geomembrane at Special Parts of the Site

Construction Difficulties of Geomembrane at Special Parts of the Site

time:July 29, 2025 Views:304

The laying and welding of geomembrane at the intersection of slopes are special cases. Diaphragms within irregular areas, such as corners, should be cut into an “inverted trapezoid” shape, with a smaller upper width and a smaller lower width (Note: There seems to be an error in the original text where it says “upper width small, lower width small” twice; here it is interpreted as the intended meaning of an inverted trapezoid with different upper and lower widths). Special treatment is also required at the slope toe where the channel slope connects to the site bottom. Throughout the construction process, for areas that need repair after sampling and locations where normal welding cannot be carried out, construction rules should be formulated based on the actual on-site conditions, and special techniques should be adopted for construction.

There are many situations in the geomembrane construction process that are easily overlooked or difficult to handle. If we deal with these situations casually or neglect them during construction, it will pose potential risks to the entire anti-seepage project. Therefore, geomembrane manufacturers remind us of the construction difficulties of geomembrane at special parts of the site.

1. The laying and welding of geomembrane at the intersection of slopes are special cases. Diaphragms within irregular areas, such as corners, should be cut into an “inverted trapezoid” shape. Operators should accurately calculate the width-to-height ratio according to the actual on-site conditions and the specific dimensions of the slope. If the ratio is not correctly determined, the film surface on the slope will “bulge” or “hang”.

2. Special treatment is also required at the slope toe where the channel slope connects to the site bottom. The construction key points in this situation are as follows: The film on the slope should be laid along the slope and extend 1.5 m away from the slope toe, and then be welded with the film at the site bottom.

3. Throughout the construction process, for areas that need repair after sampling and locations where normal welding cannot be carried out, construction rules should be formulated based on the actual on-site conditions, and special techniques should be adopted for construction. For example, the secondary welding of “T-shaped” and “double T-shaped” welds belongs to welding at special positions.

Knowledge Base
Share:
info@tinhygeosynthetics.com Bai Jinxi
Consultation

    Get The Latest Product Prices

    Your inquiries are welcomed at any time and please feel free to contact us via email, phone calls, and online chatbox on our site.

    We will definitely give you a reply ASAP after we receive your messages.

      0/180