Resources
Company News
Industry News
Knowledge Base
Project Cases
Innovation
Tinhy and University of Jinan Celebrate Six Years of Industry–University Collaboration
Empowering New Talent, Building the Future: Tinhy Successfully Conducts New Employee Orientation Training
Tinhy Conducts Comprehensive Emergency Drill to Strengthen Workplace Safety Defenses
Company Mid – Year Summary and Team – Building Activity Report
Is geomembrane a geotechnical engineering material?
What are the application scenarios of geomembrane?
What are the functions of geotextiles?
Cómo elegir geomembrana de hdpe en proyectos de ingeniería
How to choose hdpe geomembrane in engineering projects
¿Qué ancho elegir para geomembrana?
China’s Geotechnical Construction Materials Embrace New Opportunities
Tips for Moisture-Proof Storage of Geotextiles
Key Construction Points and Precautions for High-Density Polyethylene Geomembrane
what is pond lining material ?
What is geomembrane?
HDPE geomembrane construction plans and technical measures
What quality tests do HDPE geomembranes need to do?
Tinhy’s MDS® Drainage Solution
Installation Robots
Best Geomembrane for Mining: A Complete Guide to Choosing the Right Liner for Mining Projects
HDPE Geomembrane Sheet: The Complete Guide to Waterproofing, Containment, and Environmental Protection
What Is a Geosynthetic Clay Liner? Benefits, Applications, and Why Engineers Choose Film-Coated GCLs
What Is Nonwoven Fabric Geotextile? The Ultimate Guide to Filtration, Drainage, and Infrastructure Protection
HDPE Textured Liner: Why It Is the Best Choice for Slope Stability and Environmental Containment
HDPE Smooth Liner: 10 Powerful Reasons It Remains the Best Choice for Modern Containment Projects
Non Woven Geotextile for Drainage: Is It Better Than Woven Geotextile?
High Density Polyethylene Geomembrane: Why It Has Become the Industry Standard for Containment Systems
Top Non Woven Geotextile Fabric Manufacturers in 2026: Complete Buyer’s Guide
High Density Polyethylene Pond Liner: Why More Pond Owners Are Switching to HDPE in 2026
Should HDPE or PVC be used to install geomembrane in reservoirs?
What is the price of geomembrane?
Material characteristics of three different geomembranes
Esquema de construcción de geomembrana de HDPE y medidas técnicas
hdpe geomembrane pond liner in Congo (DRC)
How to lay and weld HDPE geomembrane?
HDPE geomembrane 0.2-4.0mm
HOME ABOUT PRODUCTS APPLICATION CONTENTUS RESOURCES
Home Resources Company News How to Apply Drainage Boards Into the Project of Tunnel Construction?

How to Apply Drainage Boards Into the Project of Tunnel Construction?

time:October 11, 2022 Views:547

Generally speaking, drainage solutions always play an essential role in a tunnel construction project. Although there are lots of difficulties in the whole process of construction, Shareholders need to ensure that the proper drainage and waterproofing plan is implemented by not only the contractor but also by everyone in the design and installation process. In a word, most waterproof and drainage projects related to tunnel construction should take the principle of “drainage and blocking” and adopt featured solutions for local hydrogeological conditions.

 

What Is A Drainage System?

 

A drainage system is a mechanism to remove liquids away from where they are not required for disposal in proper locations. This system can collect anything from drains to remove rain or stormwater to drain the water. To accomplish the whole procedure, high-quality drainage materials and systems should be applied to the anti-seepage project of tunnel construction.
Drainage boards, also known as Dimple Sheets or Drainage Sheets, are usually transported to the tunnel by a car or truck and laid in the tunnel, wrapped outside the tunnel, and welded into large pieces using a “nail-free” craft.

 

4 Tips To Establish A Good Drainage System With Drainage Boards

 

1. Design and Install A Waterproof and Drainage Layer

 

Before the installation of the waterproof layer, the exposed bolt head that initially supports the drainage board surface should be cut and wrapped with mortar. After smoothing the uneven part with mortar, non-woven geotextiles(also known as non-woven fabrics) and dimple sheets will be fixed from the arch lining towards both sides of the tunnel. Moreover, geotextiles shall be fixed with cement nails and PVC gaskets in advance while drainage sheets can be welded firmly to the gaskets by hot air welding machines.

Some Know-how(s):

  • When fixing the drainage board, a certain margin should be reserved according to the flatness of the spray anchor that supports the surface to prevent it from being squeezed by the concrete because of the over-tightening status.
  • To make the joints of drainage sheets well welded, the length of every drainage board should be 0.5-1.0 meters longer than that of the lining to facilitate joint welding construction.
  • The constructing joint of the drainage board and lining should be staggered by 0.5-1.0 meters.
  • After dimple sheets are paved, the concrete should be cast in place as soon as possible.
  • When the concrete lining of the soft rock section closely covers the excavation surface, protective measures shall be taken to reserve the joint of the dimple sheet at the end of the lining to prevent flying stones from damaging the drainage board.

 

2. Proper Measures For Soft Permeable Pipe Blind Ditch

 

The reserved length of the pipe joint should be considered when processing and cutting the flexible permeable pipe to ensure that both ends of the annular blind pipe can fully enter the longitudinal blind ditch. Permeable pipes need to closely contact the shotcrete surface while a certain degree of looseness must be guaranteed, and should not be overly stretched. In the meantime, exposed anchors that fix permeable pipes should be cut or smoothed with mortar to prevent puncturing the drainage board. All in all, to prevent water leakage and damage to the pipe joints, they should be well-treated during construction. In addition, all of the joints in the pipes should be checked before cementing procedures.

 

3. Pay Special Attention to the Structural Joint Waterproofing Issue

 

Structural joint waterproofing in the tunnel circle, longitudinal construction joint, and settlement joint is often the weak point of structural waterproofing. A back-mounted PVC water stop should be attached between the drainage sheet at the structural joint and the secondary lining concrete to improve the structural joint’s water resistance ability. An experienced geotechnical engineer will know what water stop and waterproofing materials must be used when pouring concrete. The tamping of the butt joints must be paid more attention to because damage or dislocations of the water stop can occur.

 

4. Other Auxiliary Waterproofing Measures

 

When the local water leakage occurs after the tunnel is excavated, embedding rigid plastic pipes can be used for diverting the water to the scupper hole at the side wall for drainage. As for the seepage water that covers a large area, drainage boards could be put into use for draining this water away. Last but not least, an MF7 plastic blind ditch needs to be set every 50 meters in the section without an inverted arch or under the road for drainage when concentrated groundwater is found at the bottom of the tunnel.

 

Conclusion

 

A mature draining system applied in the anti-seepage project of tunnel construction has three essential factors: drainage boards or geomembranes to resist and divert moisture and excess water from the footings, a footing drain that collects the water and leads it to a catch pit, and a pump that flows the water into an exterior drain, or rainwater collecting system. Sometimes, with sloping lots, the gravity is enough to pull water from the footing drains.

Company News
Share:
info@tinhygeosynthetics.com Bai Jinxi
Consultation

    Get The Latest Product Prices

    Your inquiries are welcomed at any time and please feel free to contact us via email, phone calls, and online chatbox on our site.

    We will definitely give you a reply ASAP after we receive your messages.

      0/180