Resources
Company News
Industry News
Knowledge Base
Project Cases
Innovation
Tinhy and University of Jinan Celebrate Six Years of Industry–University Collaboration
Empowering New Talent, Building the Future: Tinhy Successfully Conducts New Employee Orientation Training
Tinhy Conducts Comprehensive Emergency Drill to Strengthen Workplace Safety Defenses
Company Mid – Year Summary and Team – Building Activity Report
Is geomembrane a geotechnical engineering material?
What are the application scenarios of geomembrane?
What are the functions of geotextiles?
Cómo elegir geomembrana de hdpe en proyectos de ingeniería
How to choose hdpe geomembrane in engineering projects
¿Qué ancho elegir para geomembrana?
China’s Geotechnical Construction Materials Embrace New Opportunities
Tips for Moisture-Proof Storage of Geotextiles
Key Construction Points and Precautions for High-Density Polyethylene Geomembrane
what is pond lining material ?
What is geomembrane?
HDPE geomembrane construction plans and technical measures
What quality tests do HDPE geomembranes need to do?
Tinhy’s MDS® Drainage Solution
Installation Robots
Best Geomembrane for Mining: A Complete Guide to Choosing the Right Liner for Mining Projects
HDPE Geomembrane Sheet: The Complete Guide to Waterproofing, Containment, and Environmental Protection
What Is a Geosynthetic Clay Liner? Benefits, Applications, and Why Engineers Choose Film-Coated GCLs
What Is Nonwoven Fabric Geotextile? The Ultimate Guide to Filtration, Drainage, and Infrastructure Protection
HDPE Textured Liner: Why It Is the Best Choice for Slope Stability and Environmental Containment
HDPE Smooth Liner: 10 Powerful Reasons It Remains the Best Choice for Modern Containment Projects
Non Woven Geotextile for Drainage: Is It Better Than Woven Geotextile?
High Density Polyethylene Geomembrane: Why It Has Become the Industry Standard for Containment Systems
Top Non Woven Geotextile Fabric Manufacturers in 2026: Complete Buyer’s Guide
High Density Polyethylene Pond Liner: Why More Pond Owners Are Switching to HDPE in 2026
Should HDPE or PVC be used to install geomembrane in reservoirs?
What is the price of geomembrane?
Material characteristics of three different geomembranes
Esquema de construcción de geomembrana de HDPE y medidas técnicas
hdpe geomembrane pond liner in Congo (DRC)
How to lay and weld HDPE geomembrane?
HDPE geomembrane 0.2-4.0mm
HOME ABOUT PRODUCTS APPLICATION CONTENTUS RESOURCES
Home Resources Company News Protection, packaging and transportation requirements of seven geomembranes

Protection, packaging and transportation requirements of seven geomembranes

time:May 23, 2023 Views:431

Geomembrane is a geotechnical material whose main function is to prevent seepage. It is a modern environmental protection material used in tunnels and roads, breeding, reservoirs, landfills and other places.

There are many types of geomembrane materials. The main materials are HDPE, PVC, EVA, etc. According to the different components of raw materials, geomembranes with different product characteristics can be produced.

For example, on the premise of ensuring product quality, reducing the amount of polyethylene can produce more flexible LDPE. If PVC is used, the geomembrane will become more flexible. This production method is also Let the geomembrane adapt to more application scenarios and have better adaptability.

The characterization of the geomembrane itself requires professional transportation and protection measures. Today I will talk to you about the points that should be paid attention to in the transportation of geomembranes.

Basic requirements for protection

1. The goods can only be packed according to the packing list after the paint is dry, the inspection is qualified, and measures such as rainproof, moisture-proof, mildew-proof, shockproof, rust-proof, and partial protection of key parts have been taken; There is a special person to supervise the loading to prevent missing or wrong loading; the supplier must provide relevant photos of the packaging and protection of the goods before delivery.


2. Equipment or materials packaged in bare, bundled, or framed form, such as flanges, bolts, exposed surfaces of processed parts, and packaging frames, must be coated with protective oil or anti-rust paint and properly blocked, limited, etc. protected measure. All the equipment in the packing box should be able to be stored in the open air on site for more than 12 months.


3. (or follow the specific provisions of the supply contract), keep it intact. Regardless of whether it is in the port or on-site storage site, the storage must be carried out in accordance with the storage specifications or the storage requirements on the packing box.

Geomembrane shipping packaging mark

The packaging, storage and transportation signs are composed of four signs: trade marks (transportation marks), commodity marks, packaging marks, and temporary marks of domestic arrival consignees. 

Among them, various trade signs (transportation marks) and commodity signs are printed according to the format and requirements stipulated in the contract.

Requirements for brushing packaging, storage and transportation marks

Logo font and size: Packaging, storage and transportation logos should be clear and conspicuous. English should be printed in capital letters, Chinese should be in bold, and all kinds of logos should be sprayed or printed with non-fading eye-catching ink or paint and hollow font templates. 

The size of the font should be compatible with the size of the packaged object, avoiding the font being too large or too small, and each box should not be less than two marks, which should be sprayed and used correctly according to the position of the mark.

unpacked goods

1. For bare and frame packaging, use screws or rivets to fix the metal marks on the two sides of the base or frame, or fix them on the signboard, and then weld the signboard on the base or frame packaging. The size of the signboard shall be 20mm each in the length and width directions of the signboard, and the thickness shall not be less than 3mm.


2. For bundling, you can use the bolt hanging method to fix the metal marks, which are firmly tied on the two sides of the equipment. About 50mm.

Company News
Share:
info@tinhygeosynthetics.com Bai Jinxi
Consultation

    Get The Latest Product Prices

    Your inquiries are welcomed at any time and please feel free to contact us via email, phone calls, and online chatbox on our site.

    We will definitely give you a reply ASAP after we receive your messages.

      0/180